It is currently Thu Mar 28, 2024 1:24 pm

All times are UTC




Early Switching Eleco GR2 with shallow bowl

Details

Early Switching Eleco GR2 with shallow bowl
Early Switching Eleco GR2...

Leaning tower of Beta 5!
Leaning tower of Beta 5!

Early Switching Eleco GR2 with shallow bowl

Details
Uploaded by: mazeteam
Imagename: Early Switching Eleco GR2 with shallow bowl
Image Description: This is a rare lantern, and so it is nice to see it working. The lantern is also timeswitched (I believe) as there is no visible cell on the lantern or the column bracket. Taken at 14.47 on a february afternoon, these pictures show the lantern having recently switched on - nearly 2 hours before it should be on. This is also another clue that the lantern is clock-controlled.
Image BBCode:
Image-URL:
Link to resizeable image: imgsrv.php?i=http://ukastle.co.uk/discussion/gallery/image.php?album_id=1&image_id=1050
Uploaded: Thu Feb 03, 2011 12:44 am
Views: 1365

EXIF-Data - show/hide

Jump to:  

Powered by phpBB Gallery © 2007, 2009 nickvergessen

cron