PostPosted: Sun Mar 17, 2019 8:24 pm 
Offline
Member
User avatar

Joined: Mon Nov 09, 2009 5:27 pm
Posts: 1665
Images: 196
It's worse than that, because a couple of months ago they all had the "strap and cable" treatment to keep them safe from their design fault of falling off the columns. They could have just removed the lanterns a couple of months early rather than retrofitting each and every one only to remove them all again. It was daft that they were installed in the first place though, given that the lighting was all "condemned" by the upcoming smart motorway works. It was never going to be installed remotely long enough to pay itself back.


Top
 Profile  Personal album 
 
PostPosted: Sun Mar 24, 2019 7:47 am 
Offline
Member
User avatar

Joined: Mon Nov 09, 2009 5:27 pm
Posts: 1665
Images: 196
All columns from the central reservation in the M27 J7-8 area have now been removed. What with the removal of lighting plus the gantries, the area looks a lot more rural than urban now.


Top
 Profile  Personal album 
 
PostPosted: Wed Apr 03, 2019 11:21 pm 
Offline
Member
Random avatar

Joined: Fri Feb 24, 2012 8:01 pm
Posts: 54
Will these be reinstalled once works are complete?
Highways England didn't reply to my tweet.


Top
 Profile  
 
PostPosted: Tue Apr 30, 2019 4:54 pm 
Offline
Site Administration
User avatar

Joined: Mon Nov 09, 2009 5:38 pm
Posts: 3189
Images: 27
Location: Salisbury
Work with respect to the lighting removal between J7-8 have been in these stages, with approximately 1 week between each stage - although other works have been going on at the same time.

Column removal - but leaving base plinths and supply cables including cut-outs intact.

Cut out removal - and addition of green (presumably "safe to touch") labels to cable ends.

Break out of concrete base plinths but leaving reinforcing bars contained within plinth intact. Cabling still in place. I suspect a much bigger re-bar cage remains below the surface, especially given the columns were 18m tall.

Removal of exposed rebar.

Cabling removed/or cut below surface (difficult to see as foundation was surrounded by barriers), foundation hole filled with concrete flush to road surface.

Only the plinths west of J7 now remain.

Given all of the above and that no new cable ducting has been laid in the central reservation east of J7 through to J8, it seems unlikely that lighting will return. The slip road lighting between J7 and 8, remains in situ and working - for the moment.


Top
 Profile  Personal album 
 
PostPosted: Wed May 01, 2019 7:16 pm 
Offline
Member
User avatar

Joined: Mon Nov 09, 2009 5:27 pm
Posts: 1665
Images: 196
I think the recommendation was that lighting is no longer justified going by modern standards, but that if Highways England choose to go against this and reinstate the lighting then that's purely their choice.


Top
 Profile  Personal album 
 

Display posts from previous:  Sort by  


Post new topic Reply to topic  [ 45 posts ] 

All times are UTC



You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  

Who is online

Users browsing this forum: Bing [Bot] and 0 guests



Search for:

cron